TABLE 1


LDRD FUNDING
[In millions of dollars]
FY 1997   actual FY 1998   estimated FY 1999   estimated
Total LDRD funding (LANL, LLNL, and SNL) 184.6 190.3 204.5


















TABLE 2


COOPERATIVE THREAT REDUCTION FUNDING FOR RUSSIAN BALLISTIC MISSILE SUBMARINE DISMANTLEMENT
[End of fiscal year—in millions of dollars]
Prior years FY 98 FY 99-02
SLBM Launcher/SSBN Elimination:
Equipment/Infrastructure 34 6 40
Elimination efforts (30 submarines) 35 190
Training/Logistics/Program Support 7 4 29
Liquid Low Level Radioactive Waste Processing 30
Missile Elimination 1 7 26
Total 42 82 285

Notes.—All amounts provided through Nunn-Lugar funding; SLBM = Submarine Launched Ballistic Missile.

















TABLE 3


1991 1992 1993 1994 1995 1996 1997 1998 1999
DOE:
Naval Reactors Development12301191562101691008055
NAVY R&D:
Advanced Nuclear Power SystemsAdvanced Nuclear Power SystemsAdvanced Nuclear Power SystemsAdvanced Nuclear Power SystemsAdvanced Nuclear Power SystemsAdvanced Nuclear Power SystemsAdvanced Nuclear Power SystemsAdvanced Nuclear Power SystemsAdvanced Nuclear Power SystemsAdvanced Nuclear Power Systems
Advanced Submarine System3 Development42366

1The amounts for the formative years are best estimates of the effort leading up to and related to the New Attack Submarine propulsion plant. In this period, which is similar to what the Navy is going through now on CVX, the Program was assessing possible propulsion plant features and the state-of-the-art in various technical areas for applicability, and interfacing with the fleet and activities responsible for other aspects of the ship. Consequently, this was a period of some flux and uncertainty. In setting forth the estimates for the period the effort was made to include the cost of efforts considered specific to the New Attack Submarine propulsion plant.

2Under cognizance of Naval Sea Systems Command (NAVSEA), Code 08, Nuclear Propulsion Directorate.

3Under cognizance of Navy Program Executive Office for Submarines (PEO SUBS) with work performed by NAVSEA, Code 03, Engineering Directorate. Funding is shown only for the period 91-93 to provide reference for the formulation period of the New Attack Submarine. This Program Element covers the Hull Mechanical and Electrical aspects of the ship. This category funded the main turbines, shaft, thrust bearing and the propulsor, i.e. propeller.