TABLE 6


Force XXI initiatives Accelerated fielding by Promising technologies
Motar Fire Control System Three years. Currently in engineering and manufacturing development (EMD) Provides more accurate and faster mortar fire from mobile platform.
Army Airborne Command and Control System (A2C2S) Accelerates the EMD phase 21 months. Currently in EMD A2C2S provides situational awareness in any terrain.
Avenger Slew-to-Cue New Start. Currently in development Uses Ground Base Radar, Forward Area Air Defense Command and Control System and slew-to-cue to acquire aerial threats at extended range.
Combat Synthetic Training Assessment Range New Start. Currently in EMD For new battle command trainers at National Training Center and Fort Hood, Texas.
Force XXI Initiatives Accelerated Fielding By Promising Technologies.
Striker 15 months. Currently in EMD Scour vehicle that determines range of targets and ratifies artillery and armored units.
Light-Weight Laser Designator Rangefinder 18 months. Currently in EMD Manportable laser designator with day/night and all weather capability.
Gun Laying Positioning System (GLPS) 20 months. Currently in development GLPS decreases the time needed to position towed artillery for rapid firing.
Applique For Digitized Force Developing the applique for the Army's digitized armored systems.
Tactical Internet For Digitized Force Provides for the development of advanced digital systems for the Army's digitized armored systems.
Radio Frequency Technologies (RF Tags) 18 months. Currently completing integration of hardware and software for two brigade sets RF Tags provides ability to track materiel through the distribution system. Provide data on container contents, shipment data and vehicle identification.
Pallatized Load System—Enhanced (PLS-E) New Start. Currently in development PLS-E provides the capability to track convoys loads in progress, and redirect loads to another source.


















TABLE 7


[In millions of dollars]
Fiscal year—
1999 2000 2001 2002 2003 Total
Fiscal year 1999 President's Budget 0 5.0 10.6 5.3 7.7 28.6
Accelerated RDTE 7.4 11.7 5.8 7.6 0 32.5
Funding Delta +/(–) 7.4 6.7 (4.8) 2.3 (7.7) 3.9




















TABLE 8


[In million of dollars]
Fiscal Year:
1998
9.6
1999
24.4
2000
53.1
2001
66.3
2002
5.6
Total
159.0


















TABLE 9


[In millions of dollars]
Fiscal year—
1999 2000 2201 2002 2003 Total
Fiscal year 1999 President's Budget 0 5.0 10.6 5.3 7.7 28.6
Acclerated RDTE 7.4 11.7 5.8 7.6 0 32.5
Funding Delta +/(–) 7.4 6.7 (4.8) 2.3 (7.7) 3.9




















TABLE 10


Fiscal year 1999 President's Budget
Fiscal year 1999
20.73
Percent change
6.95
Fiscal year 2000
21.10
Percent change
1.80
Fiscal year 2001
22.62
Percent change
7.20
Fiscal year 2002
24.16
Percent change
6.78
Fiscal year 2003
24.67
Percent change
2.13




















TABLE 11


Fiscal year:
1997
6
1998
15
1999
25
2000
21
2001
24
2002
38
2003
55
2004
57
Total
241